Revisiting Last Week

GOALS LAST WEEK:

  • Figure out where my time Goes – Well, I already knew this.  Toward reading Glee Fanfiction.  I did manage to finish two books and my sweater this week so that is certainly progress.
  • Finish the Sleeves – Accomplished!  Just need to wash and lay out (clear off sweater mat)
  • Finish the first month of my poncho – Okay, this is not finished, I did manage to add on 3 balls and I am almost ready to add on the 4th.  After that I will need to knit through about  6 more balls to reach the next part of the pattern.  With slow days I might be able to finish this by the end of the month.
  • Work on the first month of my crochet cowl – No Progress
  • Decide on next project (not Jimmy Beans Wool)
    • Socks, knit
    • Ladybug Cowl from Kelly’s Knit Club
    • Cover for Strickt Planner, Knit – Cast on and knit the first 2 rows of this.
    • New Sweater from Kit (You have about 3)
  • Finish Winding the warp for your first rug, 10 epi – There has been no progress made on my garage.  I have done some winding of this, but there really isn’t a rush right now.
  • Figure out how many inches each of the sections on the sectional warp beam are supposed to cover. – Since there are 19 segments and the reed is 35 Inches I have the first and last covering about 1/2 an inch with the middle sections each covering 2 inches (or twenty ends) of warp.  If the interview goes well and I get the job (and find a house that will fit my looms) then once I’m settled and have all of my expenses taken care of I intend to buy enough cones to use the sectional beam the way it was meant to be, wind on about 800 yards of warp and go to town with rugs!  It’s fun to dream!
  • Look up information about job for interview, figure out some questions like benefits package, outreach efforts, community demographics, etc.- Looked up the library and its rules, very clear and concise.  What you think of when you think of a library.  I am certainly looking forward to this interview.

 

In other news, I do not have a photo of the finished sweater, with the 3/4 sleeves it does not look that different from the last photo.  I hope to get pictures soon.  I do have a photo of my progress on my poncho, I really like how the colors are coming together, though I am a bit concerned about how the actual construction will work.  Oh well, no point in worrying. 

IMG_2625.JPG

There might be a slight amount of puckering along one edge, but I am choosing to believe the adage, “That Will Block Right Out” to save my sanity.  The newest pattern release for the Sherlock Afghan Monthly Square has just dropped this will make the 8th square that has dropped, out of those 8 I’ve made 1.  Oh well, I’ll always have the patterns and the yarn so I can work on those when I get a yen to do something else in worsted.  So, setting goals for the week (realizing that I tend to peter out near the end of the week and with one colleague going, an interview on the horizon, and another colleague with an interview pending) I am going to keep my goals simple.

THIS WEEK’S GOALS:

  • Get through my Skype Interview
  • Call the garage to get my inspection and brakes
  • Work on my Poncho, ultimately I would like to get to the second portion
  • Complete at least 10 rows on my Strickplaner cover
  • Keep working on my budget/budget plan
  • Figure out a food plan that includes:
    • Decent Food
    • Vegetables
    • Not a ton of expense
    • Quick to make
    • Easy to take with me for work
    • Containers that are either disposable or dishwasher safe

Okay, that should be more than enough to keep me busy.  If I manage to finish winding the warp and putting it on the warp beams that would be gravy.  Also if I manage to pick up the crochet cowl or cast on the knit flat sock those would be bonuses as well.

Until next week Remember to Live Life a Little More Abstract!

Updates and Completions

IMG_2357(1)

I completed and blocked my Jimmy Beans Cowl, since this photo was taken I have also seamed it together and worn it.  I love how this worked out, I adore that it got me to think outside my box and work on learning new stitches.  The detailed instructions certainly helped me to get over my fear of trying something different with my knitting.  This new found fearlessness with my knitting has helped me along with starting my Sherlock Knit Along Square (well they are rectangles, but pretty close to square).

img_2381.jpg

I have 5 rows out of 87 completed.  Honestly this is Cascade 220 superwash merino wool in worsted weight on size 8 needles.  Each row is going very quickly.  With my Jimmy Beans Knitting kit I received these highlighter flags that allow me to highlight one row for about 2 inches, this means that for each row I need 3-4 of these for this pattern, but they really do help me keep track of where I am in the pattern.  I probably would have gotten further already however, once I had finished the 4th round reading the pattern from my ipad, I was concerned that my eyes would wander to the wrong line.  I waited until today to print off my pattern so I can highlight each line as I need them.  I hope to do some more on this square tonight, I love seeing how it develops as I read each pattern line and knit them stitch by stitch.  The only other progress on this is that I am considering purchasing a specific mat that will allow me to block all of my squares at one time on the same set of pegs so that they are all perfectly blocked to the correct dimensions.  This was recommended for the Moogly 2019 Crochet Along (CAL) that involves granny squares.   Since I am committed to the Jimmy Beans Projects and the Sherlock KAL I do not think I will take up the Moogly challenge, but I do like the idea of all of my KAL blocks being the precise same size.

For the Lots of Socks Challenge I am going to finish my second sock (of the same colorway so not really in the spirit of things) tonight when I get home from work.  I had finished the toe and tried it on, only to find that when they say 1 inch from the end of the sock, they really mean, when your toes start.  I must have known this for the first sock, but forgot for the second.  So I ripped out the seam, undid the toe section, and added 4 more rows to my sock.  It now matches the previous sock, this will free me up to work on my Baker Street Socks.

I know that I have not written about my crochet project from Jimmy Beans in a little while, It is coming along slowly but surely.  Apparently I managed to put 10 extra stitches into the bottom, which means that all 28 rows of my sides had 10 extra stitches.  No wonder I ran out of yarn.  This has resulted in my needing to order more yarn.  I hope that the 4 balls I ordered are enough to finish this off completely, however, the pattern calls for ending with 45 stitches left so that the pouf can be stuffed, washed, and emptied.  I would rather close it off, but there is leeway if I decide not to buy any more yarn.

The final project I was working on was a simple knit dishcloth.  I finished it a couple of months ago but forgot to post about it.

IMG_2317.JPG

I will freely admit that I love the darn thing.  There really is nothing like washing with a cotton dishcloth.  It is so thick that the soap lathers up beautifully and there are absolutely no scratchy parts at all.  If I were a faster knitter (and had a smaller family) I think I would make these for everyone for Christmas.  I might do that, it just might take a few years!

Happy Crafting and Remember to Live a Life A Little More Abstract!