It is hard to believe that the fall semester is starting up in a couple of weeks! At present it looks like I will be working at all three of my jobs starting at the end of this month. This is going to greatly decrease my financial stress, increase my workload, and decrease my crafting time. Since I love to work, this is a positive move overall. However I am planning on taking these next couple of weeks to organize some projects so that they are easy to pick up and put down. The first is my insane idea that I am going to sew myself a very simple pencil skirt. For my first try I have measured the fabric so that there is plenty to go around my waist and that the length is something I can live with. I have then folded over the top to create a channel for a drawstring. I pinned down the edge of the channel so that the raw edge is tucked under and I can try to stitch the folded edge down.

By pre-threading my needles and running the thread over beeswax, I am ready to start stitching when I have a couple of minutes. I can only take a couple of stitches at a time before my back starts killing me, so I have to find a way to work on that.
My melt and pour experiment did not work out how I wanted it to. Either I put too much glitter between the layers or there was too much wait time between pours.

I have some goats milk melt and pour soap coming in the mail this week so soap will get a take 2 next weekend. Hopefully the next batch is better.
I have also managed to get Lady, my spinning wheel, cleaned up and ready to go. My Firefly electric wheel has been a lifesaver, however I am now able to get back to spinning some with Lady. I managed to finish spinning a small batt of Corriedale, and there was even enough for me to weave a sample on my Ashford Sample It Loom at 5 ends per inch.

The final project that I have made progress on is my second worsted weight sock. I am ready to turn the heel! These are going to work wonderfully with the new shoes I purchased, in the hopes that they will last more than six months. If they fit, I might just plan on using the yarn I purchased for my Sherlock afghan as socks instead.

With Lady ready to go, end plenty of fiber to spin, needles threaded and ready to be stitched, as well as socks ready to knit (we aren’t discussing the shawl I’m knitting, it’s a KAL so I am not going to get it done on time), my fall is looking to be full of fun, crafting, and work.
Remember to Live Life a Little More Abstract.